update of the ongoing work to renovate the home. Just the first floor is shown.
Here's a link to the first post on the home: years-in-https://hyperblogal.blogspot.com/2021/04/a-story-134-years-in-making.html
Drywall is finished, along with some painting. Trim is installed.
Above, this was originally Bishop Hendrix Office/Study. Below, original staircase.
Above, living room. Two below kitchen cabinet installation underway.
Above, tile finished in one of the bathrooms.
Above and below, patio/deck finished.
Drywall is finished, along with some painting. Trim is installed.
Above, this was originally Bishop Hendrix Office/Study. Below, original staircase.
Above, living room. Two below kitchen cabinet installation underway.
Above, tile finished in one of the bathrooms.
Above and below, patio/deck finished.