Below working on the new porch railing for the second floor/front balcony.
Above, the false ceiling on the front porch has been removed and the brickwork behind it is being repaired.
The following shots show the electrical work and plumbing that has already been done.
Above the floor to ceiling window can be opened for access to the porch outside.
Tower room got new windows too.
Preparing to install the first new railing on the second floor.